Clogaenog Forest Wind Farm Webinar

06 May
Wednesday 6th May 2020
1pm
Free

Clogaenog Forest Wind Farm 

Constructing Excellence in Wales together with our colleagues at ICE Wales Cymru, CECA , CIWEM and CIHT are hosting a Webinar on 6th May with Jones Bros who will present on the development of the Clogaenog Forest Wind Farm.

Jones Bros Civil Engineering UK started work as Principal Contractor in December 2017 following the award of a (circa) £20 million contract, from Innogy Renewables UK. The wind farm is capable of generating enough renewable energy for the equivalent domestic needs of up to 64,000 average UK households annually.

Jones Bros has constructed 8km of new access tracks, upgraded 20km of existing tracks, built crane hard standings, completed the installation of cabling to connect the turbines to the electricity grid and has completed the 33kV/132kV substation, 4 different types of submerged turbine foundations were also designed, 3 of these turbine foundations were of a gravity based design and one was a piled design solution. Having many different design options available made it possible for Jones Bros to utilise the best foundation design for the ground conditions at turbine locations. Crane Hard Standing Platforms were lowered or raised wherever possible, toa cut & fill balance on earthworks.

clocaenog-wind-farm.jpg

The benefits to the local community, with a £19 million community development fund being made available to the local community from Innogy, the use of local labour and materials and the recruitment of apprentices through JB in-house training scheme.

Click here to book your place. When you book your place you will get a link for joining the webinar in your confirmation email.